Presses, molds, conveyors, ovens, tooling, motors, and electrical enclosures are cleaned in place — frequently hot and without teardown — so the maintenance window shrinks instead of stretching.
Serving Mecklenburg, Union, Cabarrus, Gaston, Iredell counties and nearby Concord, Gastonia, Rock Hill along the I-85 / I-77 interchange.
Distribution and light manufacturing along I-85 toward Gastonia and Concord, food and beverage production, motorsports fabrication shops, and data-center and financial back-office facilities where electronics cleaning must be dry and non-conductive.
What a Charlotte industrial scope looks like
Step 01
Line walk and downtime plan
Assets are prioritized against the actual outage window, with test panels on representative surfaces to confirm pressure and dwell before the shutdown starts.
Step 02
Ventilation and CO2 monitoring
CO2 is heavier than air. Monitors and forced ventilation are set for pits, tanks, and low-lying spaces, held to a 5,000 ppm TWA and 30,000 ppm STEL.
Step 03
In-place blast cleaning
Adhesive, resin, carbon, release agent, grease, and product buildup come off without disassembly, cooldown, solvents, or grit in the machine.
Step 04
Restart and record
No media to collect and no wastewater to capture. Equipment goes back to production immediately with a per-asset record of settings and condition.
Standard of care
Work is planned around your lockout/tagout program, confined-space permits, and NFPA 70E boundaries, with CO2 monitoring and ventilation sized to the space before the first trigger pull.
Common Charlotte calls
Crawlspace mold that fails pre-sale inspection
Dry ice blasting removes staining and spore load from joists, subfloor sheathing, and band boards in one dry pass, then the encapsulation and dehumidification plan keeps clearance results holding through a Charlotte summer.
Kitchen and electrical fire smoke in multifamily
Acidic soot on exposed steel, ductwork, and framing is lifted without rinse water, so adjacent occupied units are not exposed to runoff or extended drying.
Production equipment cleaning without teardown
Conveyors, molds, and tooling are cleaned hot and in place across the I-85 corridor, cutting changeover and cool-down time out of the maintenance window.
Industrial questions from Charlotte property owners
Can you clean electrical equipment energized?
We work de-energized under your LOTO program as the default. Where energized work is unavoidable, it happens only inside your NFPA 70E boundary rules with your electrical authority involved.
Is dry ice blasting safe around food production?
The media is food-grade CO2 that sublimates completely, leaving no rinse water and no chemical carryover. It supports HACCP sanitation programs, but it is a cleaning step, not a substitute for your validated sanitizer.
How much downtime should we plan?
Most in-place work is scheduled inside an existing outage. Because there is no disassembly, no rinse, and no dry-down, the cleaning step usually removes hours rather than adding them.